Manufacturer: Sara Lee
Full Building Refurbishment
Client: | Sara Lee & Building Owner |
Location: | Ryde Rd, Pymble, NSW |
Head Contractor: | CBD Projects |
Interior Design: | BBR |
Total Cost: | $3,150,000 |
Time to Complete: | 26 weeks |
Total Floor Area: | 3500m2 |
Project details
CBD Projects acted for the Building Owner and Sarah Lee in a full refurbishment and fit out of the building.
The building owner had purchased the entire building as a rundown office block, so a full building upgrade was required including all services, ceilings, flooring, toilets, car parking and lift.
Mid way into the refurbishment a tenant (Sara Lee) was found for the full building, so an integrated fit out was designed for Sara Lee, this included a new staircase and atrium to be constructed on to the front of the building for access between the 3 levels.
Due to the age of the building fire upgrades and BCA upgrades were carried out.
"We have engaged CBD Projects and its Principal Mr Robert Bowles for over 8 years. We have always found Robert to be a person of high integrity and our projects have always been completed on time and on budget. The sites are run efficiently with due regard to work safety and co-ordination of the various trades. In our business as Property Investors and Managers having Robert and CBD Projects available has been a valuable asset."