Manufacturer: Sara Lee

Full Building Refurbishment
Client: Sara Lee & Building Owner
Location: Ryde Rd, Pymble, NSW
Head Contractor: CBD Projects
Interior Design: BBR
Total Cost: $3,150,000
Time to Complete: 26 weeks
Total Floor Area: 3500m2
Special Construction Requirements

Project details

CBD Projects acted for the Building Owner and Sarah Lee in a full refurbishment and fit out of the building.

The building owner had purchased the entire building as a rundown office block, so a full building upgrade was required including all services, ceilings, flooring, toilets, car parking and lift.

Mid way into the refurbishment a tenant (Sara Lee) was found for the full building, so an integrated fit out was designed for Sara Lee, this included a new staircase and atrium to be constructed on to the front of the building for access between the 3 levels.

Due to the age of the building fire upgrades and BCA upgrades were carried out.

Testimonials

"We have engaged CBD Projects and its Principal Mr Robert Bowles for over 8 years. We have always found Robert to be a person of high integrity and our projects have always been completed on time and on budget. The sites are run efficiently with due regard to work safety and co-ordination of the various trades. In our business as Property Investors and Managers having Robert and CBD Projects available has been a valuable asset."
Director
Unison