Client: | CNDS |
Location: | Crows Nest , NSW |
Head Contractor: | David Swan |
Interior Design: | David Swan |
Total Cost: | $800,000 |
Time to Complete: | 8 weeks |
Total Floor Area: | 400 sq mts |
CBD projects worked closely with the designer and client to overcome the complexities of building a Medical Day Surgery within a mixed use building of commercial and residential, especially meeting the fire code for a class 9 construction within a class 5 building.
After the design and council stage the works took 8 weeks on site, these works included 2 theatres, recovery 1 with 4 beds and recovery 2 with 4 chairs; this also included all the required nurses stations, full fire rated CSSD, staff and client facilities and reception for 10.
Due to the existing shell being quite restrictive in heights etc, the Mechanical plant had to be specially designed for the operating theatres. Project completed ahead of schedule expediting our clients Accreditation application.
Fire rated partitioning
Custom built joinery throughout
Specialist Air-Conditioning system installed
Feature flooring
"May I extend my heartfelt thanks for the extraordinarily professional and enjoyable last 8 weeks which have lead to the competition of our state of the art specialist day surgery centre. The CBD Projects team managed by Robert Bowles was a pleasure to work with; nothing was too much trouble, whenever I required a progress report or advice - solutions were free flowing. I'm missing their cheery personalities. We really appreciated that you completed the project ahead of the handover date. It has given us more time to prepare the facility for accreditation."